Fort Hunter Liggett MW Solar Micro Grid
Jolon, CA
Jolon, CA
Design/Build delivery for the 1 MW Solar Grid project which provides a large percentage of Fort Hunter Liggett’s (FHL) current annual energy demand. FHL is one of the locations recently identified by the Army to be a pilot Net Zero Installation. As part of the Army’s overall effort to conserve precious resources, net zero installations will produce as much energy or water as they consume and eliminate solid waste to landfills. The Solar Micro Grid project is the initial project to embark on the journey to the Net Zero Energy goal and to become a center of environmental and energy excellence. Robert A. Bothman is currently constructing Phase II including an additional 1 MW Solar Grid on the same site.